Construction Technology of House Building Project

Building Project

Compared with the in-place pile, the pore-forming pouring pile is more Building Project simple and convenient, with a wider range of construction. In the actual construction process, it is able to pass through Building Project complex bottom layer and water layer underground without very high requirements in equipment. The actual bearing capacity of single pile is very strong, so that it can be better to adapt to the actual needs of different scales or the different geological conditions in building. And it has been promoted and used greatly in building construction work [1]. This paper introduces the concept of the pore-forming pouring pile technology, analyzes the pore-forming construction technology and the pile construction technology, then talks about prevention problems of the pore-forming pouring pile construction in House Building Project, at last draws a conclusion that the pore-forming pouring pile technology is the most basic construction technology and is the most effective and convenient way of construction.

The pressure of social economy development increasingly urges the unceasing increase of people’s material life level. The population also exhibits a very strong agglomeration effect. The pace of urbanization development is increasing, in addition, more and more pressure of living prompted the city to build some high buildings with more storeys with the aim to effectively alleviate the population living pressure. Due to the design, technology, raw materials and supervision work of the housing building construction are imperfect, which will lead to the main crack of the wall, even building collapse and other problems in the following construction. What’s worse, it seriously influences the use function and the actual construction life of the building, which causes great threat to the life and property of the building army and people. Therefore, it needs to combine with the building foundation construction process to comprehensively control the construction technology, and also needs to control the actual construction work according to the difference of construction conditions, in order to completely dip reinforced cage work into the hole after the work of forming holes and finally finish the concrete pouring work in the aggregate housing construction work. In short, in the construction of housing construction work, it needs to pay attention to the application of bored pile construction technology and adhere to the scientific and reasonable methods, to provide protection and enhance the quality of housing construction [2] .

In the construction of housing construction, the technology of the pore-forming pouring pile plays an important role. The technology of the pore-forming pouring pile actually is using the construction mechanical drilling, artificial mining or soil squeezing pipe in terms of construction in the process, so as to form a pile in the building foundation. The pile hole and concrete pouring are used to set reinforcement cage and ponder the hole, which is the most widely used and the most effective perfusion technique of foundation pile currently. Due to there are some differences in the hole forming way, the cast-in-place pile is mainly divided into the immersed tube, digging holes and hole type. And due to there are differences in the formation of piles, finally the construction method of the pore-forming pouring pile is formed.